Public Right of Way


Types of inspection required within the PROW include but are not limited to:

  • Water Utilities
  • Sewer Utilities
  • Storm Drain Utilities
  • Land Drain Utilities
  • Sidewalks
  • Curb & Gutter
  • Approaches

Permit to Work in the Public Right of Way

  • Proper licensing in the State of Utah to perform the requested work
  • Certificate of Liability naming Brigham City Corporation as additionally insured
  • Bond in the amount of $10,000
  • Full list of requirements

For questions regarding these requirements, please contact the Public Works Administrative Assistant at 435-734-6615 or send an email to Jolene Crockett.

Notification of Inspections

It shall be the responsibility of the person responsible for construction to insure that inspections take place where and when required.

Continuous inspections require 3-day notification prior to the commencing of the work, i.e. water and sewer mains, asphalt and concrete work.

Periodic inspections require 24-hour notice prior to the commencing of the work, i.e. service lateral replacements, excavations, concrete forms.

Job Site Requirements:

  • Approved set of plans
  • Proper permits (State, Local, Federal)
  • Blue Stakes
  • Notification of Road Closure to Brigham City Public Works
  • Traffic and pedestrian control to MUTCD Standards
  • OSHA Requirements

Links:

Contact Information

Kyle Holgreen
Public Works Inspector
Office:  435-734-6615
Email:  Kyle Holgreen

Jolene Crockett
Administrative Assistant
Public Works Department
Office:  435-734-6615
Email: Jolene Crockett